Licensed FL CBC1267322 · FRO9007
$2M Insured 60,000+ Piers Installed 866-398-9323
Commercial Service

Foundation underpinning — transfer load to deep, stable soil.

Underpinning is the right call when the existing footing is intact but the soil below it has failed. We attach steel brackets to the existing footing and helical piers carry the load down to bearing strata. The original footing becomes a load-distribution pad; the helicals do the work.

Patriot Foundation Systems & Foundation Systems Supply Certified
Lifetime Structural Warranty
Free Estimate · 866-398-9323

When underpinning is the right system

Underpinning addresses a specific failure mode: the footing is sound, but the soil under it has failed:

  • Older homes (pre-1980) with shallow strip footings on poor soil
  • Settled additions tied to deeper original footings
  • Structures over former wetlands or filled ground
  • Buildings adjacent to recent excavation that disturbed bearing soil
  • Retrofits before adding loads (second story, heavy equipment)
  • Insurance claim work where the footing is documented intact
Underpinning vs. pier installationOn new construction we install helical piers as the primary foundation. On existing structures with intact footings, we underpin — brackets and helicals work together so the original footing stays in place.

Why Florida footings need underpinning

Most underpinning we do isn’t because of footing damage — it’s because of soil failure under it:

  • Karst voids opening below an originally-sound footing
  • Sand washout from groundwater flow or storm surge
  • Clay shrinkage during dry seasons in inland counties
  • Drainage failure saturating soil under the footing
  • Bearing pressure increases from additions or modifications

How we underpin

A steel bracket attaches to the existing footing — typically with anchor bolts and welded connections. Helical piers drive vertically through the bracket sleeve to bearing strata. Hydraulic load-test verifies each bracket-pier assembly to specified capacity, then the underpinning system carries the structure’s load instead of the failing soil.

What you can expect — typical timeline.

  • Free inspection & quote — within 3 business days of your call
  • Engineer-stamped design — 5–7 business days after acceptance
  • Permit pulled and crew scheduled — 1–2 weeks (varies by county)
  • Installation — typically 2–5 days for a residential project
  • Lift, load test, warranty issued — same day as install completion

Foundation Underpinning by region

We deliver this service across all 8 of our Florida regions. Click any region to see local soil conditions and recent project context:

Foundation Underpinning in Florida Cities

The 20 most-served Florida cities for this service — click any city for local soil conditions and a free on-site quote:

Reviews

What Florida homeowners say.

Real reviews from our Lake City Google Business Profile — covering work across all eight Florida service regions.

4.9
220+ reviews · A+ BBB